Port Alberni Excavating
Text or call (778) 909-4232Free Quote

Updated August 2026

Do You Need a Permit for Excavation in Port Alberni?

Yes, most structural excavation needs a permit. Inside Port Alberni the City issues it under Building Bylaw No. 5077; on rural property at Sproat Lake, Beaver Creek or Cherry Creek, the Alberni-Clayoquot Regional District issues it instead. We pull the permit as part of the job.

Updated August 2026

A permit is authorization from the City or the Regional District confirming that the work meets the applicable bylaws before and after it's done.

We pull the permits as part of excavation.

Inside Port Alberni

Building work in the city goes through the City of Port Alberni under Building Bylaw No. 5077, alongside its Zoning Bylaw No. 5105, Development Procedures Bylaw No. 5076 and Subdivision and Development Bylaw No. 4130. The standard building permit application fee is $100.

Outside the city

At Sproat Lake, Beaver Creek and Cherry Creek, the Alberni-Clayoquot Regional District issues building permits for rural property in its electoral areas. Its application fee is also $100, and the rest of the permit fee is scaled to the value of the work.

What needs a Regional District permit

A permit is required to construct a new building or structure, make alterations, additions or repairs, complete a previously unfinished area, make interior structural renovations, demolish or relocate a structure, locate or relocate a manufactured or mobile home, build or remodel a deck, construct a swimming pool, install or alter plumbing, install a new chimney or fireplace, enclose a carport, or change the use or occupancy.

What's exempt

Installing cupboards, roofing repairs or replacement with no structural change, exterior finish repair or replacement, and a building under 10 square metres — a storage shed, for example — don't need a permit.

Soil removal inside the city

The City's Soil Removal and Deposit Regulation Bylaw No. 3947 regulates the removal or deposit of soil, sand, gravel, rock or other material from or onto land in Port Alberni. We check this bylaw before we move material off your lot.

Excavation permits in Port Alberni at a glance
Permit or requirementAuthorityWhen it applies
Building permitCity of Port AlberniStructural work inside city limits
Building permit (rural)Alberni-Clayoquot Regional DistrictRural property in its electoral areas
Soil removal or depositCity of Port AlberniMoving soil, sand, gravel or rock in the city
Electrical permitTechnical Safety BCAny electrical work, city or rural
Utility locateBC 1 CallBefore any digging — valid 30 days

How permits work with your excavation

  1. 1

    On-site assessmentwe confirm which authority applies and what the job needs.

  2. 2

    Locate and permitswe call BC 1 Call and file the permit before work starts.

  3. 3

    Excavation and inspectionwe complete the work, and the City or Regional District inspects it against the bylaw.

Electrical work

Electrical work on a project is permitted separately through Technical Safety BC, regardless of whether your property is inside the city or in a Regional District electoral area.

For pricing, see the cost guide.

Port Alberni Excavating pulls permits across Port Alberni, Sproat Lake, Beaver Creek and Cherry Creek, throughout the Alberni Valley.

Not sure which permits your project needs? Request a free assessment and we'll help you sort it out.